In large construction
projects, such as this
skyscraper in Melbourne,
cranes are essential. |
In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.
For the successful execution of a project, effective planning is essential. Those involved with the design and execution of the infrastructure in question must consider the environmental impact of the job, the successful scheduling, budgeting, construction site safety, availability of building materials, logistics, inconvenience to the public caused by construction delays, and bidding, etc.
Types of construction projects
In general, there are three types of construction:
- Building construction
- Heavy / civil construction
- Industrial construction
Each type of construction project requires a unique team
to plan, design, construct, and maintain the project.
Building construction
|
A building site for a row of riverside apartment blocks in Cambridge |
Building construction is the process of adding structure to cheese graters
real property. The vast majority of building construction projects are small renovations, such as addition of a room, or renovation of a bathroom. Often, the owner of the property acts as laborer, paymaster, and design team for the entire project. However, all building construction projects include some elements in common - design, financial, and legal considerations. Many projects of varying sizes reach undesirable end results, such as structural collapse, cost overruns, and/or litigation reason, those with experience in the field make detailed plans and maintain careful oversight during the project to ensure a positive outcome.
Building construction is procured privately or publicly utilizing various delivery methodologies, including hard bid, negotiated price, traditional, management contracting, construction management-at-risk, design & build and design-build bridging.
Residential construction practices, technologies, and resources must conform to local building authority regulations and codes of practice. Materials readily available in the area generally dictate the construction materials used (e.g. brick versus stone, versus timber). Cost of construction on a per square metre (or per square foot) basis for houses can vary dramatically based on site conditions, local regulations, economies of scale (custom designed homes are always more expensive to build) and the availability of skilled tradespeople. As residential (as well as all other types of construction) can generate a lot of waste, careful planning again is needed here.
The most popular method of residential construction in the United States is wood framed construction. As efficiency codes have come into effect in recent years, new construction technologies and methods have emerged. University Construction Management departments are on the cutting edge of the newest methods of construction intended to improve efficiency, performance and reduce construction waste.
Industrial construction
|
Construction of a prefabricated home |
Industrial construction, though a relatively small part of the entire construction industry, is a very important component. Owners of these projects are usually large, for-profit, industrial corporations. These corporations can be found in such industries as medicine, petroleum, chemical, power generation, manufacturing, etc. Processes in these industries require highly specialized expertise in planning, design, and construction. As in building and heavy/highway construction, this type of construction requires a team of individuals to ensure a successful project.
Construction processes
In the modern industrialized world, construction usually involves the translation of paper or computer based designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including architects, landscape architects, interior designers, surveyors, civil engineers, cost engineers (or quantity surveyors), mechanical engineers, electrical engineers, structural engineers, and fire protection engineers. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner will typically award a contract to the most cost efficient bidder.
The modern trend in design is toward integration of previously separated specialties, especially among large firms. In the past, architects, interior designers, engineers, developers, construction managers, and general contractors were more likely to be entirely separate companies, even in the larger firms. Presently, a firm that is nominally an "architecture" or "construction management" firm may have experts from all related fields as employees, or to have an associated company that provides each necessary skill. Thus, each such firm may offer itself as "one-stop shopping" for a construction project, from beginning to end. This is designated as a "design Build" contract where the contractor is given a performance specification, and must undertake the project from design to construction, while adhering to the performance specifications.
|
Shasta Dam under construction
in June 1942 |
Several project structures can assist the owner in this integration, including design-build, partnering, and construction management. In general, each of these project structures allows the owner to integrate the services of architects, interior designers, engineers, and constructors throughout design and construction. In response, many companies are growing beyond traditional offerings of design or construction services alone, and are placing more emphasis on establishing relationships with other necessary participants through the design-build process.
The increasing complexity of construction projects creates the need for design professionals trained in all phases of the project's life-cycle and develop an appreciation of the building as an advanced technological system requiring close integration of many sub-systems and their individual components, including sustainability. Building engineering is an emerging discipline that attempts to meet this new challenge.
Financial advisors
Many construction projects suffer from preventable financial problems.
Underbids ask for too little money to complete the project.
Cash flow problems exist when the present amount of funding cannot cover the current costs for labour and materials, and because they are a matter of having sufficient funds at a specific time, can arise even when the overall total is enough.
Fraud is a problem in many fields, but is notoriously prevalent in the construction field. Financial planning for the project is intended to ensure that a solid plan, with adequate safeguards and contingency plans, is in place before the project is started, and is required to ensure that the plan is properly executed over the life of the project.
Mortgage bankers, accountants, and cost engineers are likely participants in creating an overall plan for the financial management of the building construction project. The presence of the mortgage banker is highly likely even in relatively small projects, since the owner's equity in the property is the most obvious source of funding for a building project. Accountants act to study the expected monetary flow over the life of the project, and to monitor the payouts throughout the process. Cost engineers apply expertise to relate the work and materials involved to a proper valuation. Cost overruns with government projects have occurred when the contractor was able to identify change orders or changes in the project resulting in large increases in cost, which are not subject to competition by other firm as they have already been eliminated from consideration after the initial bid.
Large projects can involve highly complex financial plans. As portions of a project are completed, they may be sold, supplanting one lender or owner for another, while the logistical requirements of having the right trades and materials available for each stage of the building construction project carries forward. In many English-speaking countries, but not the United States, projects typically use quantity surveyors.